Gymnasium monastery Mallersdorf

performance range

  • shock absorbing wall cladding system (acoustical effect by perforation 8/16 mm)
  • equipment- storage space gates
  • doors with anti-panic function
  • stage construction (Folding stage with hydraulic drive, electrically operated)

architect

Lechner + Lechner Architekten
St. Oswaldstraße 2
D-83278 Traunstein

client

Kloster Mallersdorf
Klosterberg 1
D-84066 Mallersdorf- Pfaffenhausen

completed

2008

total amount

167.000 €